profit plan

英 [ˈprɒfɪt plæn] 美 [ˈprɑːfɪt plæn]

利润计划

经济



双语例句

  1. A distribution of profit plan which is not yet approved is to be identified in notes to the financial statements.
    仅有利润分配方案,而未最后决定的,应当将分配方案在会计报表附注中说明。
  2. Must profit from "the positional warfare" positively the beneficial experience, has the step, to have plan advancement with steady steps.
    必须积极借鉴“阵地战”的有益经验,有步骤、有计划的稳步推进。
  3. For the fourth quarter, net profit was down as the company took a charge tied to a restructuring plan.
    第四季度,公司由于在重组计划上的开支,净利润有所下滑。
  4. The thesis shows that project management is that constructors supervise the investment, progress profit, strategic plan, design, construction and maintenance with opinions, theories and methods of systems engineering.
    工程项目管理是工程建设者运用系统工程的观点、理论和方法,对工程的投资、管理、进度、质量、效益及决策,规划设计、实施建设,运营维修进行全方位、全过程的管理。
  5. In the competition environment of time is profit, how to use the computer technology to realize the production scheduling optimization, to adjust resource assignments quickly and to plan production with due consideration for all concerned has become a great subject for many manufactory.
    在当今时间就是利润的竞争环境下,如何利用计算机技术实现生产调度计划优化,快速调整资源配置,统筹安排生产进度,提高设备利用率已成为摆在许多加工企业面前的重大课题。
  6. Business value is function about profit ability and risk level, so business value plan should be made as follows: the first, it should make corporate profit ability and risk level plan;
    因为企业价值是公司盈利能力和风险水平的函数,所以企业价值规划应按以下步骤进行:首先,应该对公司盈利能力和风险水平进行规划;
  7. Short-term Decision and Profit Plan in Alkali& Chloride Enterprise
    氯碱企业的短期生产决策与利润规划
  8. During the management and audit, profit and loss analytical method can be applied in checking, evaluating the manufacture prosecution plan or engineering items of the audited departments to improve the management and raise economic benefit.
    在管理审计中,可以应用盈亏分析法对被审计单位的生产经营计划或工程项目进行考核、评价,据以改善管理,提高经济效益。
  9. Adjusting agricultural bank profit plan and eliminating "The Martin Effect";
    调整农行利润计划,消除马太效应;
  10. However, in a long-term view, the airport's profit and Strategic plan base on safety, which is an eternal subject of the airport.
    然而从长远来看,机场的利润点和战略计划还是基于机场的安全性能来展开的。
  11. Investment purpose to get profit maximize, and this plan show us the profit logic and provide clear direction for running it.
    投资的目的是为了最大化的盈利率,该计划书体现了盈利逻辑,为项目的运营提供了明确指引。
  12. Knowledge and intelligence of labor for the enterprise profit contribution, the role of plan and control evaluation management system about enterprise assets is very important.
    建立对知识劳动和智力劳动对企业利润的贡献,或对企业资产作用的计划控制评价管理体系至关重要。
  13. Later, the thesis expands the single-stage model into the two-stage model by increasing the game links and establishing functions between the profit distribution and the effort level, to find the optimal benefits distribution plan.
    之后,将单阶段的利益分配模型通过增加博弈环节、建立知识联盟企业努力水平与利益分配的函数关系,扩充为两阶段的利益分配模型,并进行分情况讨论,找到最优的利益分配方案。
  14. In this paper, profit sharing mechanism of supply chain includes the constituent elements of mechanism, specific implementation plan, feedback mechanism three parts. The paper interprets the purpose of profit sharing, principle, subject, object, etc. through a combination of symbiotic theory.
    本文将供应链利益分配机制分为机制的构成要素、具体实施方案、反馈机制三个部分,通过结合共生的相关理论阐述了供应链利益分配的目的、原则、主体、客体等。
  15. The potential and the profit evaluation of CLC in Ningxia, including the potential, the plan scheme and the profit while putting CLC into practice.
    宁夏耕地整理的潜力及效益评价,包括宁夏耕地整理的潜力、宁夏耕地整理的规划方案和宁夏耕地整理的效益评价。
  16. At first Kansei Design is cater to the perception of expending and carry on the related design passively for profit. Then companies plan to develop the market gradually with Kansei Design.
    感性设计最初是为了迎合逐渐产生的感性消费,基于商业考虑被动地进行相关设计;后来随着理论研究的不断深入,发展到有计划有意识地用感性设计开拓市场。
  17. The principal goal of project construction management is that makes the project profit maximization, that is the deviation minimum between the plan construction period and the actual construction period and effectually control project fund flow in order to reach the goal of the construction enterprise project management.
    工程项目施工管理研究的根本目标是使项目的利润最大化即计划工期与实际工期之间的偏差最小化,以有效地控制项目资金流,从而达到施工企业项目管理的目标。